Critical Path
Shoot the wood crates to create shortcuts through the maze.
Try to outrun the snowstorm!
The speed of the storm and the amount of indestructible metal crates increases with each level you complete.
Download and install for best experience.
| Status | Released |
| Platforms | HTML5, Windows, Android |
| Rating | Rated 4.0 out of 5 stars (1 total ratings) |
| Author | Jonas H |
| Genre | Action |
| Tags | 2D, Arcade, Fast-Paced, High Score, lone-survivor, maze, Procedural Generation, Top-Down |
Download
Download NowName your own price
Click download now to get access to the following files:
CriticalPathAndroid.zip 20 MB
Critical_Path.exe 37 MB

Leave a comment
Log in with itch.io to leave a comment.